Hibco was the nominated main contractor in this new 150-bedroom care home in Oranmore, Galway. The original building was a hotel “The Ramada” which lay derelict for 7 years. Scope of the project was a major structural design and alteration to bring the building up to current healthcare and fire specifications outlined by the HSE, HIQA and Galway City Fire Services. Works included lift shaft alteration, stair core demolition & re-build/modification right through to a turnkey fit out of the building. Upon completion it will consist of a 150-bed facility over 100,000 sq feet including 100 car spaces. See Our RTE News Coverage
- Phase 1: Completed 2019. 46 bedrooms fully occupied.
- Phase 2: Completed in 2020. 13 suites and 18 bedrooms